3. In the openings of the vertical part of the frame installing we the wood floor. Now, the first field of scaffolding stands by itself, and it upgrade all other fields.
4. When assembling the final fields we install the finish tubes who are connected with the double wall.
Installation of the first scaffold field
1. Scaffold can be mounted just on enough bearing ground. With insufficient load-bearing soil shall be provided with parts that will allow distribution of load. In the case of uneven terrain, it is necessary to use special PGO bases. The first dual wall will be placed between the first two vertical frames.
2. The next steps in the assembly of the first field is set up the ladders. They are intalling between the two scaffolds fields.


The Company PGO Ltd. engage with the production of Scaffold Systems. High quality wath prowed of the Institute ZIK(Quality Superintending Company Ltd.) in Zagreb (Croatia) and the University of arhitecture in Mostar(Bosnia and Herzegowina).